Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
Permit Number - T09PL00829
Inspection Description - PLUMBING - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/08/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. INSTALL PER INSTALLATION INSTRUCTIONS (SUPPLY WATER THRU FILTER THEN SOFTENER) 2. OVERFLOW TO DRAIN TO EXTERIOR WITH APPROVED MATERIAL (GRAVITY DRAIN) 3. PROVIDE PROOF PER MANUFACTURER THAT BOTH DRAINS CAN BE MANIFOLDED TO WASHER BOX OR PIPE FILTER TO EXTERIOR WITH APPROVED MATERIAL WHERE WATER WILL BE ABSORBED. |
|
06/05/2009 | PLUMBING - FINAL | Cancelled | CANCELLED PER HOMEOWNER RICHARD PAYNE #730-3566 | |
06/05/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* OWNER CANCELED |
|
06/02/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1:30 NO ACCESS PLEASE RECALL WHEN AN ADULT WILL BE PRESENT TO PROVIDE ACCESS |