Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 1) CORRECTIONS MADE OK 2) OK FOR GAS |
|
| 10/09/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE PSI TEST MINIMUM OF 10 PSI 2) REMOVED TEE AT UDERGROUND AT WATER HEATER PAN 3) RUN T & P TO WATER HEATER 6" TO 24" OFF GROUND 4) PUT GROUND WIRE ON COLD WATER SIDE |
|
| 09/28/2009 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) REQUIRE MINIMUM 10 POUND TEST 2) THREAD PROTECTORS ARE NOT APPROVED COUPLINGS 3) GAS PIPING MAY NOT RUN ALONG THE GROUND, BUT MUST BE AT LEAST 6" ABOVE GRADE 4) AT WATER HEATER: NO SEDIMENT TRAP, T & P RELIEF DRAIN NOT APPROVED (CHECK VALVE), WATER HEATER VENT NOT APPROVED, NOT TERMINATED PROPERLY 5) MUST BE ON AN APPROVED BASE |