Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2009 | PLUMBING - SEWER HCS CONNECT | Approved | IVRS - Inspection :* | |
| 10/29/2009 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE VERIFICATION OF GRADE BY ENGINEER FOR FINAL |
|
| 10/27/2009 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection :* 1) CONNECTION TO EXISTING 4" CLAY AT CURB OK TO COVER |
|
| 10/26/2009 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection :* 1) COW PRESSURE AIR TEST OK 2) NEED TO SEE FIAL CONNECTION TO 4" CLAMP OK TO COVER |
|
| 10/23/2009 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection :* SDR35 INSTALLED TO POC AT 4" |
|
| 10/22/2009 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection :* 1) 4" SDR 35 EXTEND TO 45 DEGREE TURN-OK TO COVER 2) S.T.V.G. AND TEST AT A LATER DATE |
|
| 10/21/2009 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection :* 1) COURTESY UNSCHEDULED INSPECTION FOR MIKE 2) 4 STICKS SDR INSTALLED FROM PROP LINE TO GATE, LESS THAN 1 PERCENT REQUIRES VERIFICATION OF GRADE 3) WILL TEST LATER, COVER AT OWN RISK |