Permit: T09PL00529

Parcel: 130171860


Addresses:

4129 E 29TH ST #101

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
05/22/2009 PLUMBING - ROUGH, SOIL Approved
04/27/2009 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
PIPE WRAPS AND FLOOR SINKS INSTALLED, RUN TEST ON INTERCEPTOR TIE IN TO BLD. SEWER OK

1. PROVIDE FRANK PATTERN CLEANOUTS IN CONCRETE FLOOR AREAS AND IN SIDEWALKS FOR TRAFFIC AREAS (PEDESTRIAN RATED PER PLAN)
04/24/2009 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
WATER TEST THRU BLD. WITH CLEANOUTS TO 10' ONLY TO INTERCEPTOR WITH VENT OK

1. PROVIDE EXTERNAL TRAP ON DISCHARGE END OF INTERCEPTOR WITH FLOW TEST
2. HAVE PIPE WRAPS AND FLOOR SINKS FOR PRE-SLAB PRIOR TO CONCRETE INSPECTION.
04/21/2009 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. REMOVE ALL MOISTURE FROM DISCHARGE AREA OF INTERCEPTOR TO VERIFY NO LEAKAGE
2. VENTS BELOW FLOOD RIM OF FIXTURE TO BE LONG RADIUS DRAINAGE FITTINGS
3. PROVIDE 1O' HEAD TEST ON BOTH PIPING SYSTEMS
GREASE AND SANITARY
4. EXPOSE FITTINGS & PIPING ON BOTH SYSTEMS
(GREASE AND SANITARY)
5. POINT OF VENT TO BE MINIMUM OF CENTER LINE OF DRAIN FOR HORIZONTAL VENTING AND REQUIRES LONG RADIUS FITTINGS BELOW FLOOD RIM OF FIXTURE
6. WHERE ARE THE FLOOR CLEANOUTS PER APPROVED PLAN
7. PROVIDE INFORMATION ON GREASE INTERCEPTOR FOR FLOW CONTROL AND SIZE
8. WHERE IS DOWNSTREAM CLEANOUT FOR GREASE DISCHARGE PER PLAN
9. INSTALL TEST FITTINGS OK CLEANOUTS FOR INTERMEDIATE DWV TEST THRU ROOF OR YOU WILL BE REQUIRED TO RETEST UNDERGROUND AGAIN
10. APPROVED EXTENSION TO GRADE IS REQUIRED FOR INTERCEPTOR

LIST MAY NOT BE COMPLETE
04/09/2009 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
WATER TEST FROM POINT OF CONNECTION TO EXISTING
4" SEWER UPSTREAM TO 3" CLEANOUT IN SIDEWALK ONLY
REVISED APPROVED PLAN IS REQUIRED FOR CITY OF TUCSON
04/08/2009 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. INSTALL 2-WAY CLEANOUT PER PLAN
2. PROPERLY BED YOUR PIPING SO IT IS ON A FIRM BED NO BRIDGING OR USE OF ROCKS TO SUPPORT PIPING.