Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) 2ND STOP |
|
| 04/16/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED MINIMUM 10 PSI FOR GAS PRESSURE TEST, DUE TO HOT AND COLD WEATHER CONDITIONS-SHOULD FILL TO ABOUT 15 PSI. I'M READING GAUGE AT LESS THAN 8 PSI BEFORE 9:00 IN THE MORNING |
|
| 03/18/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NOT ENOUGH PRESSURE ON GAUGE 2) NEED MINIMUM 10 PSI TO TEST |
|
| 03/13/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) AIR TEST NEEDED ON GAS LINE |