Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* #28 & #30 OK GAS IS ON TEST FOR NEW METER PIPING (ONLY) |
|
| 03/17/2009 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* #28 - WATER HEATER VENT TO CONNECT TO DRAFT HOOD AND TEMPERATURE AND PRESSURE RELIEF TO HAVE DRAIN TERMINATING DOWNWARD OUTSIDE OF WATER HEATER ENCLOSURE. #30 - FLOOR FOR WATER HEATER SHALL BE MADE STRUCTURALLY CAPABLE OF SUPPORTING WATER HEATER AND VENT FROM WATER HEATER MUST BE CONNECTED TO DRAFT HOOD AND BE MADE UP CORRECTLY. WATER HEATER TEMPERATURE AND PRESSURE RELIEF REQUIRES DRAIN PIPING TO DAYLIGHT TERMINATING AT DOWNWARD DIRECTION OUTSIDE OF WATER HEATER ENCLOSURE. MAKE CORRECTIONS LISTED AND RECALL 03050 & 03090 INSPECTIONS FOR FINAL APPROVAL AND CLEARANCE CARDS |