Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2009 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 03/03/2009 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PRESSURE TEST OK 2) PRIMER WRAP GAS PIPE 6" ABOVE GRADE AT STORAGE ROOM 3) GAS SHUT OFF REQUIRED BELOW UNION AT STORAGE ROOM 3) PTR LINE SHALL DISCHARGE DOWNWARD 6" MINIMUM 24" MAX FROM SLAB 4) 3-SCREWS REQUIRED FROM B-VENT TO DIVERTER AND AT VENT JOINTS, REMOVE TAPE FROM DBL VENT PIPE |