Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: SITE - SEWER
Permit Number - T09PL00061
Inspection Description - SITE - SEWER
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/25/2009 | SITE - SEWER | Approved | IVRS - Inspection :* | |
07/21/2009 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) VACUUM TEST M.H. #1 2) MIRROR AND MANDRELL |
|
07/20/2009 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* | |
06/01/2009 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 8" DIP EXTENDED TO MANHOLE #1 OK BLDG. DRAIN EXTENDED TO MANHOLE #1 I'D LIKE TO SEE BASE POURED AND RINGS SET |
|
05/21/2009 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1) 8" D.I.P. INSTALLED FROM PROPERTY LINE CLEANOUT NORTH TWO HUNDRED FEET OK TO COVER, SUBJECT VERIFICATION OF GRADE AND TESTING |
|
05/19/2009 | SITE - SEWER | Partial Approval | 8" DIP INSTALLED FROM MANHOLE IN ROGER RD. TO PROPERTY LINE CLEANOUT OK -- VERIFICATION OF GRADE AND TEST AT A LATER DATE. OK TO COVER. AFTER HRS. INSP. 2 HRS. TO BE PAID FROM ADOLFSON/PETERSON ACCT. $150.00 |
|
03/30/2009 | SITE - SEWER | Partial Approval | IVRS - Inspection :* | |
03/30/2009 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* NOT READY FOR INSPECTION |
|
03/20/2009 | SITE - SEWER | Partial Approval | AFTER HRS. INSP. TO BE BILLED TO ADOLFSON PETERSON ACCT. - TWO HRS. $150.00 STREET CUT TO MANHOLE TAPPED MANHOLE INSTALL D.I.P CONNECT TO D.I.P AT PROPERTY LINE |
|
03/10/2009 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* | |
02/27/2009 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* SPECIAL INSPECTION REQUESTED BY JIM BECHTEL W/AP CONST. SPECIAL BEFORE HRS. INSP. $150.00 TO BE CHARGED TO AP CONST. |
|
02/27/2009 | SITE - SEWER | Partial Approval | IVRS - Inspection :* | |
02/18/2009 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* NO NEW WORK TODAY |
|
02/17/2009 | SITE - SEWER | Partial Approval | IVRS - Inspection :* MEETING WITH WESTLAND RESOURCES CONCERNING SEWER TAP AND TIE IN AT ORACLE |
|
02/09/2009 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* VENT NOT APPROVED, VENT TO RISE VERTICALLY TO ABOVE FLOWLINE BEFORE OFFSETTING HORIZONTALLY USE DRAINAGE FITTINGS |
|
02/06/2009 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1. 4" RADIO SHACK AND 4" BASKIN ROBBINS TIED INTO 6" SDR 35 W/TRACER OK 2. INTERCEPTOR INSTALLED OK. CUT IN A VENT 3. OK TO COVER 6" SDR35 TO P.O.C AT EXISTING 6" CLAY |
|
02/02/2009 | SITE - SEWER | Not ready for Inspection | WAITING FOR RFI INFORMATION ON BASKIN ROBBINS | |
01/22/2009 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 6" PVC FROM INTERCEPTOR (NOT SET) TO EXISTING C.O. 9233*01 AT BASKIN ROBBINS INSTALLED, NOT CONNECTED TO CLEANOUT - CONTRACTOR HAS SENT RFI CONCERNING AS BUILT CONDITION |
|
01/21/2009 | SITE - SEWER | Partial Approval | IVRS - Inspection :* | |
01/20/2009 | SITE - SEWER | Partial Approval | IVRS - Inspection :* MANHOLES #2 & #3 RINGS STACKED TODAY |
|
01/16/2009 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1 8" D.I.P FROM PROPERTY LINE TO MH#2 OK TO COVER SUBJECT TO VERIFICATION OF GRADE AND TEST AT A LATER DATE. 2. MANHOLE BASES #2 & #3 POURED TODAY 3. SDR35 FROM MH#2 TO MH#3 OK TO COVER SUBJECT TO VERIFICATION OF GRADE AND TEST AT A LATER DATE 4. D.I.P STUBBED OUT OF MANHOLE #3 |