Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T09OT01819
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/04/2009 | FIRE - FINAL | Approved | approved 11/4/09. | |
11/02/2009 | FIRE - FINAL | Denied | Remove key lock and replace with thumb dead boalt on front and rear door. Patch two (2) holes in furnace room. |
|
09/08/2009 | FIRE - FINAL | Denied | 1.) Need accurate, approved floor plans. 2.) Need exit sign for main door. Must bee illuninated. 3.) Need emergency back-up lighting for both required exits. 4.) Need directional exit sign over "angle" door, NE end of building. 5.) Need thumb-turn lock for front door ,east end. 6.) Replace ceiling tile in east office. 7.) Door leading to ear exit on west side must swing in the direction of egress or can be removed from service. 8.) Remove the keyed lock the rear door and replace with a thumb-turn lock. 9.) Provide steps or fall protection for exit discharge, rear exit. 10.) Replace all missing cover plates. 11.) Portable fire extinguishers must be within 75 ft. for accessability. 12.) Remove slide-bolt lock from split-door, west office. 13.) Smoke detectors must be in working order and must be properly positioned on wall. |