Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2009 | FIRE - FINAL | Approved | ||
| 06/09/2009 | FIRE - FINAL | Denied | 1. Need to clean out water heater and furnace room. 2. Cover plates on J-box by storage next to office. 3. Exit signs and back up lighting needed showing the way out of any point of the building.(120V and battery back up) 4. Exit doors shall swing toward egress all doors swing outward. Change or remove door back from sales floor to warehouse. 5. Remove all permanent extension cords. 6. Address numbers shall be 12" high per code on paperwork given. |