Permit: T09OT00441

Parcel: 138110830

Inspection Status: Approved

Inspection History: FIRE - FINAL

Date Description Inspector Results Comments
04/07/2009 FIRE - FINAL Approved
04/03/2009 FIRE - FINAL Denied 1.) Provide a sign over the main exit that reads, "DOOR MUST REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED".
2.) Protect all ROMEX wiring up to 7 feet from floor.
3.) Remove the pad locking system from the north door in the shop area.
4.) Provide a thumb-turn lock for the north door.
5.) Secure open wiring located by the large compressor in the shop area..
6.) Prortable fire extinguishers need annual servicing. x3.
7.) Remove the keyed lock from the door leading from the shop area into the office and to the main exit.
8.) Make rear gate more accessable for property entry.
9.) Provide the approved plans.