Permit: T09OT00312

Parcel: 135074550

Inspection Status: Approved

Inspection History: FIRE - FINAL

Permit Number - T09OT00312

Inspection Description - FIRE - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
08/06/2009 FIRE - FINAL Approved
02/19/2009 FIRE - FINAL Denied 1.) Extension cords not be a substitute for permanent wiring. To be for temporary use ony.
2.) Emergency back-up lights in the cubicle area are not working.
3.) Spliced wiring is prohibioted. (conference room)
4.) Re-locate exit sign between the office area and the warehouse. Relocate to opposite side of door.
5.) Rear exit door must be readily openable without the use of a key, special knowledgeor special effort.
6.) Lable door to electrical room "ELECTRICAL or ELECTRICAL PANEL"
7.) Povide a clean area around the electrical panel.