Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2009 | FIRE - FINAL | Approved | ||
| 04/01/2009 | FIRE - FINAL | Denied | Not approved 4/1/09. 1.) Directinal signs directing to required exit must be illuminated. 2.) Cover opening inceiling located in the electrical room area. |
|
| 03/04/2009 | FIRE - FINAL | Denied | 1.) Need accurate and approved plans. 2.) Annual sprinkler inspection is past due. Last inspection on record is 7/29/04. 3.) Need updated 5 yr. sprinkler check valve inspection report. 4.) Main door exit sign is burnt out. 5.) Emergency back-up light over main door is burnt out. 6.) The exit door that will be designated as the 2nd. required exit will need an illuminated exit sign and emergency back-up lighting. 7.) Provide illuminated exit sign directing to the 2nd required exit. 8.) Provide panic hardware for the security gates located to the north of the building or remove the locking system. 9.) Cover all openings in the ceiling. 10.) Replace the face plate to electrical panel located next to the stage area. 11.) Cover plate, small stage area. 12.) Remove double cylinder lock from double-doors located between small stage area and back room. 13.) Permanent wiring shall be installed according to electrical code.ROMEX wiring 7 ft. and below must be protected in conduit., 14.) Label door leading to room with electrical panels, "ELECTRICAL" 15.) Cover plate, net to ring, back room. |