Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2010 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS HAVE BEEN MADE |
|
| 01/22/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PLEASE SCHEDULE YOUR INSPECTION WHEN SOMEONE WILL BE HOME 2) MY SCHEDULE WOULD NOT ALLOW ME TO DO AN AFTERNOON INSPECTION TODAY 3) PLEASE LEAVE A CONTACT NUMBER WHEN SCHEDULING NEXT INSPECTION |
|
| 01/14/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) REMOVE ALL FOIL TAPE FROM FURNACE VENT CONNECTION 2) PROVIDE MINIMUM 3 SCREWS IN ALL JOINTS OF VENT CONNECTOR 3) THE 3" X 4" REDUCER NEEDS TO BE CRIMPED AND INSTALLED INTO THE 1ST ELBOW 4) THE FURNACE POWER CORD MUST BE MINIMUM 6" FROM VENT CONNECTOR 5) TIGHTEN ROMEX CONNECTOR ONTO THE CORD 6) INSULATE ALL SHEET METAL DUCTING IN FURNACE CLOSET 7) 3/8" I.D. X 36" GAS FLEX NOT ADEQUATE FOR 75,000 BTU 8) EXTEND FURNACE VENT ABOVE EVAP COOLER 9) BE SURE TO USE AMERIVENT |
|
| 01/13/2010 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* |