Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2009 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 09/21/2009 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE A BUSGHIN AT PENETRATION INTO THE ELECTRIC DISCONNECT 2) TAPE BOTH ENDS OF WHITE WIRE WITH BLACK TAPE 3) PROVIDE THE REQUIRED GFI SERVICE RECEPTACLE AT THE CONDENSOR 4) REMOVE THE PIECE OF SINGLE WALL VENT PIPE ON THE ROOF AND THE SINGLE WALL ELBOW OUTSIDE THE WALL AND PROVIDE DBL WALL VENT PIPE 5) PROVIDE MIN. 1" CLEARANCE FROM COMBUSTIBLES AT WALL PENETRATION |