Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2009 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS HAVE BEEN MADE |
|
| 07/08/2009 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) USE ONLY AMERIVENT FOR ENTIRE VENT SYSTEM FOR 1 FURNACE 2) REMOVE INSULATION FROM AROUND VENT PIPES AT ROOF PENETRATION 3) LARGE CONDENSOR UNDER FUSED, 40 AMP IS MINIMUM 4) FINISH INSULATING REFER LINES OUTSIDE 5) REPLACE MELTED CONDUIT AT WALL PENETRATION |