Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: VIOL - PRECAUTION AGAINST FIRE
Case Number - T09FR03905
Inspection Description - VIOL - PRECAUTION AGAINST FIRE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/16/2010 | VIOL - PRECAUTION AGAINST FIRE | Approved | All approved / closed | |
12/29/2009 | VIOL - PRECAUTION AGAINST FIRE | Violation | Clearance below sprinklers: TFC 315.2.1 Ceiling clearance. Storage shall be maintained 24 inches (610 mm) or more below the ceiling in nonsprinklered areas of buildings or a minimum of 18 inches (457 mm) below sprinkler head deflectors in sprinklered areas of buildings. ______Remove storage to 18 inches or more below sprinkler head. Thank you, |