Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: INSP - FULL
| Date |
Description |
Inspector |
Results |
Comments |
| 12/07/2009 |
INSP - FULL |
|
Approved |
SUPPLIES REMOVED TO BELOW 18 INCHES. CLOSED! |
| 11/19/2009 |
INSP - FULL |
|
Correction Required |
Supplies stacked on top of a partition wall inside RM 12 blocking the spray pattern of the sprinkler. Rmove the obstructions. INTERNATIONAL FIRE CODE 315.2.1 Ceiling clearance. Storage shall be maintained 2 feet (610 mm) or more below the ceiling in nonsprinklered areas of buildings or a minimum of 18 inches (457 mm) below sprinkler head deflectors in sprinklered areas of buildings. |