Inspection History Details
Inspection Status: Violation
Inspection History: VIOL - BUILDING SVCS & SYSTEMS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2009 | VIOL - BUILDING SVCS & SYSTEMS | Violation | 605.1 Abatement of electrical hazards. Identified electrical hazards shall be abated. ____Repair electrical panel cover. Front hall. ____Repair outlet. West hall, 1st floor, garbage can area. Currently has exposed electrical wires. |