Inspection History Details
Inspection Status: Approved
Inspection History: VIOL - PRECAUTION AGAINST FIRE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2009 | VIOL - PRECAUTION AGAINST FIRE | Approved | 315.2.1 Ceiling clearance Storage shall be maintained 2 feet or more below the ceiling in non-sprinklered areas of buildings or a minimum of 18 inches below sprinkler head deflectors in sprinklered areas of a building. _____ Maintain proper ceiling clearance according to code. |