Inspection History Details
Inspection Status: Correction Required
Inspection History: INSP - FULL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/31/2009 | INSP - FULL | Correction Required | DURING THE MAY, 2009 ANNUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCIES WERE FOUND AND SHALL BE CORRECTED WITH IN 30 DAYS. IF CORRECTED HAVE THE CONTRACTOR OF RECORT FORWARD THEIR REVISED REPIORT. 1) THE FOLLOWING SHALL BE ADDED TO THE SPARE HEAD BOX, 2, 1/2 INCH BRASS 155 DEGREE HORIZONTAL SIDEWALL SPRINKLERS AND 2, CHROME 155 DEGREE, CENTRAL QUICK RESPONSE PENDANT HEADS 2) A SPRINKLER HEAD IN THE S/E OFFIC, NEAR THE REAR EXIT IS TO CLOSE TOP THE WALL AND SHALL BE RELOCATED. 3) THERE ARE 2 OFFICES THAT LACK SPRINKLER COVERAGE. 4) PRESSURE GUAGES ARE OUT DATED. THEY ARE REQUIRED TO BE CALIBRATED OR CHANGED OUT EVERY 5 YEARS. 5) THE MAIN CONTROL VALVE SHALL BE SECURED WITH A LOCK AND CHAIN 6) THE PHONE LINE TROUBLE AT THE ALARM PANEL SHALL BE IN REPAIR. THE REMOTE MONITERING COMPANY IS NOT RECEIVING SUPERVISORY OR WATER FLOW ALARMS 7) THE 5 YEAR INTERNAL VALVE INSPECTION IS DUE. |