Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T09FR02440

Parcel: 123020820


Addresses:

2550 E GRANT RD

Inspection Status: Violation

Inspection History: VIOL - FLAMMABLE FINISHES

Date Description Inspector Results Comments
07/24/2009 VIOL - FLAMMABLE FINISHES Violation IFC.1504.2 Location of spray-finishing operations.
Spray finishing operations conducted in buildings used for Group A, E, I or R occupancies shall be located in a spray room protected with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 and separated vertically and horizontally from other areas in accordance with the International Building Code. In other occupancies, spray-finishing operations shall be conducted in a spray room, spray booth or spraying space approved for such use.

____Stop work ordered issued for automible spray painting.