Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: VIOL - FIRE PROTECTION SYSTEMS
Case Number - T09FR02284
Inspection Description - VIOL - FIRE PROTECTION SYSTEMS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/20/2009 | VIOL - FIRE PROTECTION SYSTEMS | Approved | Construction work completed and sprinkler permit final approved by Larry Johnson. | |
07/15/2009 | VIOL - FIRE PROTECTION SYSTEMS | Correction Required | The water motor gong is inop and the water flow switch is not connected. Electrical power to the area under renovation is expected to be connected 7/24/2009. I am in contact with Randy from Chestnut Construction to have a notification method operational. |