Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T09FR02225

Parcel: 12710178C

Inspection Status: Approved

Inspection History: INSP - SELF INSPECTION PROGRAM

Case Number - T09FR02225

Inspection Description - INSP - SELF INSPECTION PROGRAM

Inspection Status - Approved

Date Description Inspector Results Comments
08/31/2009 INSP - SELF INSPECTION PROGRAM Approved
07/07/2009 INSP - SELF INSPECTION PROGRAM Correction Required 2. IFC 315.2.1: Ceiling clearance. Storage shall be maintained 2 feet (610 mm) or more below the ceiling in nonsprinklered areas of buildings or a minimum of 18 inches (457 mm) below sprinkler head deflectors in sprinklered areas of buildings.