Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: INSP - REINSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 09/03/2009 |
INSP - REINSPECTION |
|
Correction Required |
Bars on mechanical room removed and push bar installed, just waiting for ceiling tiles in bakery, 9/3/09. |
| 08/07/2009 |
INSP - REINSPECTION |
|
Correction Required |
working on doors in mechanical room, next reinspection due 8/21/09 |
| 07/30/2009 |
INSP - REINSPECTION |
|
Correction Required |
Walked through mechanical room with T. Knapp. Storage was ok but he felt the exits from original inspection needed to be addressed. |
| 07/24/2009 |
INSP - REINSPECTION |
|
Correction Required |
There is still too much stored in mechanical room. 7/24/09 |
| 07/09/2009 |
INSP - REINSPECTION |
|
Correction Required |
some corrections made, next reinspection due 7/23/09 |