Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T09FR01856

Parcel: 11460019C

Inspection Status: Approved

Inspection History: VIOL - BUILDING SVCS & SYSTEMS

Case Number - T09FR01856

Inspection Description - VIOL - BUILDING SVCS & SYSTEMS

Inspection Status - Approved

Date Description Inspector Results Comments
06/24/2009 VIOL - BUILDING SVCS & SYSTEMS Approved Electrical abated.
06/03/2009 VIOL - BUILDING SVCS & SYSTEMS Violation Blocked electrical panel:

TFC 605.3 Working space and clearance. A working space of not less than 30 inches (762 mm) in width, 36 inches (914 mm) in depth and 78 inches (1981 mm) in height shall be provided in front of electrical service equipment.

______Clear area in front of electrical panel in an approved manner.
06/03/2009 VIOL - BUILDING SVCS & SYSTEMS Violation Multiplug adapters:

TFC2006/ 605.4 Multiplug adapters. Multiplug adapters, such as cube adapters, unfused plug strips or any other device not complying with the ICC Electrical Code shall be prohibited.

______Remove noncomplying devices.
06/03/2009 VIOL - BUILDING SVCS & SYSTEMS Violation Open wire boxes/ splices:

TFC2006 605.6 Unapproved conditions. Open junction boxes and open-wiring splices shall be prohibited. Approved covers shall be provided for all switch and electrical outlet boxes.

______Cover wires in an approved manner.
06/03/2009 VIOL - BUILDING SVCS & SYSTEMS Violation Electrical wires extending through ceiling:

TFC2006/ 605.5 Flexible cords shall not be a substitute for permanent wiring. Extension cords and flexible cords shall not be affixed to structures, extended through walls, ceilings or floors.

______ Please remove wires.