Inspection History Details
Inspection Status: Correction Required
Inspection History: INSP - FULL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/14/2009 | INSP - FULL | Correction Required | Initial inspection 4/13/09 Reinspection on or after 4/27/09 I met Chief Uthe at Gavi and he signed appeal for use of fryer as long as system is in compliance in 60 days 5/20/09. |