Inspection History Details
Inspection Status: Correction Required
Inspection History: INSP - FULL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2009 | INSP - FULL | Correction Required | DURING THE ANNUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CORRECTED WITH ION 30 DAYS. A COPY OF THE REPAIR MANIFEST SHALL BE FORWARDED TO THIS OFFICE 1) THE SPRINKLER RISER HAS A LEAK ON THE CITY SUPPLY SIDE AND SHALL BE REPAIRED 2) THE PAPER THAT IS WRAPED AROUND SPRINKLER HEADS IN ISLE 5 SHALL BE REMOVED |