Inspection History Details
Inspection Status: Correction Required
Inspection History: INSP - NIGHT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2009 | INSP - NIGHT | Correction Required | DURING THE ANNUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CORRECTED WITH IN 30 DAYS. A COPY OF THE CONTRACTORS REPAIR ORDER SHALL BE FORWARDED TO THIS OFFICE. 1) PROVIDE SWAY BRACING AT THE TOP OF THE SPRINKLER RISER 2) THE TOP PRESSURE GUAGE AT THE RISER SHALL BE REPLACED OR RECALIBRATED 3) THE SPRINKLER RISER IS DUE FOR THE 5 YEAR INTERNAL INSPECTION |