Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Case: T09FR01214

Parcel: 12801005H

Inspection Status: Violation

Inspection History: VIOL - MEANS OF EGRESS

Date Description Inspector Results Comments
04/08/2009 VIOL - MEANS OF EGRESS Violation TFC 1003.6 - Means of egress continuity.
The path of egress travel along a means of egress shall not be interrupted by any building element other than a means of egress component as specified in this chapter. Obstructions shall not be placed in the required width of a means of egress except projections permitted by this chapter. The required capacity of a means of egress system shall not be diminished along the path of egress travel.

_____ Clear back hallway to the width of the exit door and maintain it this way at all times.
04/08/2009 VIOL - MEANS OF EGRESS Violation TFC 1011.1 - Where required.
Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel.

_____ Relocate exit sign @ door from dressing rooms.