Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FULL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/30/2009 | INSP - FULL | Approved | CORRECTIONS MADE, REPAIR REPORT TO SYSTEMS | |
| 04/06/2009 | INSP - FULL | Correction Required | DURING THE LAST SPRRINKLER INSPECTION THE FOLLOWING DEFICIENCIES WERE FOUND AND SHALL BE CORRECTED WITH IN 30 DAYS. A COPY OF THE CORRECTION MANIFEST SHALL BE FORWARDED TO THIS OFFICE 1) SHIRT SHOP - DUE TO OFFICE CONSTRUCTION ADDITION SPRINKLER HEADS ARE REQUIRED TO BE ADDED 2) DARK ROOM - A SPRINKLER SHALL BE ADDED TO THIS AREA 3) ADDITIONAL SPRINKLER PROTECTION SHALL BE ADDED TO THE UNDER SIDE OF THE STAIRS 4) ALL SPRINKLER HEADS BELOW 6 FEET SHALL BE PROTECTED WITH BASKETS 5) THE 5 BENT SPRINKLER HEADS BY THE ROLL UP DOOR SHALL BE CHANGED OUT 6) THE UPRIGHT SPRINKLER HEAD THAT IS IN THE PENDANT POSITION SHALL BE CHANGED OUT 7) NORTH RISER - GUAGES THAT ARE 5 YEARS OLD SHALL BE RECALIBRATED OPR CHANGED OUT. |