Inspection Status: Approved
Inspection History: INSP - SELF INSPECTION PROGRAM
| Date |
Description |
Inspector |
Results |
Comments |
| 03/18/2009 |
INSP - SELF INSPECTION PROGRAM |
|
Approved |
|
| 03/10/2009 |
INSP - SELF INSPECTION PROGRAM |
|
Correction Required |
2. IFC 315.2.1: Ceiling clearance. Storage shall be maintained 2 feet (610 mm) or more below the ceiling in nonsprinklered areas of buildings or a minimum of 18 inches (457 mm) below sprinkler head deflectors in sprinklered areas of buildings. |
| 03/10/2009 |
INSP - SELF INSPECTION PROGRAM |
|
Correction Required |
3. IFC 305.1 Clearance from ignition sources. Clearance between ignition sources, such as luminaires, heaters, flame-producing devices and combustible materials, shall be maintained in an approved manner. |