Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: VIOL - BUILDING SVCS & SYSTEMS
Case Number - T09FR00736
Inspection Description - VIOL - BUILDING SVCS & SYSTEMS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/17/2009 | VIOL - BUILDING SVCS & SYSTEMS | Approved | Panel blanks replaced and panel clear | |
02/24/2009 | VIOL - BUILDING SVCS & SYSTEMS | Correction Required | 605.3Working space and clearance. A working space of not less than 30 inches (762 mm) in width, 36 inches (914 mm) in depth and 78 inches (1981 mm) in height shall be provided in front of electrical service equipment. Where the electrical service equipment is wider than 30 inches (762 mm), the working space shall not be less than the width of the equipment. No storage of any materials shall be located within the designated working space. " Replace the "blanks" on circuit breaker box "G" and do not store combustible materials within the specified area. |