Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FULL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2009 | INSP - FULL | Approved | FINALED BY L. THOMAS 34-24-09 | |
| 03/11/2009 | INSP - FULL | Correction Required | DURING THE ANNUAL SPRINKLER INSPECTION THE FOLLOWING DEFICIENCY WAS FOUND AND SHALL BE CORRECTED WITH IN 30 DAYS. NOTE: SUBMITTALS AND PERMITS REQUIRED BY THE SPRINKLER CONTRACTOR 1) SPRINKLER PROTECTION SHALL BE ADDED TO THE TWO NEW OFFICES, THE TAX OFFICE AND THE CRICKET STORE. |
|
| 02/10/2009 | INSP - FULL | Correction Required | DEAR SIR, THE INFORMATION THAT WAS SENT TO THE FIRE PREVENTION OFFICE WAS FOR THE KITCHEN HOOD EXTINGUISHING SYSTEM. WHAT IS NEEDED IS THE ANNUAL REPORTS FOR THE INSPECTION AND TESTING OF THE BUILDING SPRINKLER SYSTEMS, FOR 2470 AND 2480 N. ORACLE. THANK YOU FOR YOUR ATTENTION TO THIS MATTER. |