Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T09EL02652
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/23/2010 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 02/09/2010 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PATCH HOLE IN ROOF |
|
| 12/29/2009 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) CALL FOR FINAL AFTER CONV. |
|
| 12/11/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* VERIFY GROUNDING RECALL INSPECTION CALLED PACE CONTRACTOR, LEFT MESSAGES ON BOTH ELECTRICANS. CALL TO TRY AND COORDINATE INSPECTIONS. NO RETURN CALL AFTER 1/2 HOURS. THE 1ST THEN 7TH INSPECTIONS PROVED TO BE UNPRODUCTIVE DUE TO LOCKED GATES, DOGS, OR UNABLE TO LOCATE SYSTEM GROUNDING TO VERIFY SERVICE IS SAFE TO CLEAN. DUE TO WORKLOAD, INSPECTOR MAY NOT BE ABLE TO PERFORM MULTIPLE INSPECTIN, AS DISCUSSED. PLEASE DO NOT CALL IN MORE THAN 5 INSPECTIONS AT A TIME OR CALL IN AS WORK BEING PERMORMED. ELECTRICAL CONTRACTOR (ELECTRICIANS) SHOULD BE AVAILABLE ON SITE AT TIME OF INSPECTIONS TO ADDRESS ANY ISSUES , ALSO THEY SHOULD GO IN AHEAD OF INSPECTION TO EXPOSE GROUNDS AND SECURE ALL---TO PROPERTY. |