Inspection History Details
Inspection Status: Partial Approval
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/01/2009 | ELECTRIC - INTERMEDIATE | Partial Approval | SPLICE AT POLE OK. NEW INSULATOR AT POLES OK. MH UMBILICAL TO 19 IN GOOD SHAPE. UMBILICAL TO #20 SHORTENED TO REMOVE DAMAGED AREA. METER BOX AT 20 REQUIRES REPLACEMENT DUE TO HEAT DAMAGE. |