Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2009 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 12/02/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1) WHERE IS GROUNDING ELECTRODE SYSTEM 2) FINISH #1,2,3 & 5 PREVIOUS INSPECTION |
|
| 10/23/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* COMPLETE ALL ITEMS FROM 9-1-09 INSPECTION. INSPECTIONS WITH NO PROGRESS WILL RESULT IN A REINSPECTION FEE. |
|
| 09/01/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) FRONT LIGHT AND BOX NEEDED 2) SECURE NM CABLE FOR HOOD AND USE A CONNECTOR AT HOOD 3) MISSING LIGHT FIXTURES 4) NEED SMOKE DETECTORS BEDROOMS 5) NEED PERMANENT METAL ADDRESS LABEL AT METER 6) FILL UNUSED OPENINGS 7) BREAKERS TO BE LISTED FOR USE BY MANUFACTURER 8) ONLY ONE GROUNDED CONDUCTOR PER TERMINAL LUG AND CONNECT ALL 9) MAIN BREAKER TO USE MANUFACTURERS HOLDOWN 10) LABEL BREAKERS 11) VERIFY COOLER WIRING TO CODE 12) RECONNECT WATER BOND |