Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2009 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 09/08/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CONNECT EQUIPMENT GROUND TO SUB PANEL 2) SEAL OPEN KNOCKOUTS IN PANEL 3) INSTALL CONNECTOR ON FEEDER CABLE AT SUB PANEL 4) INSTALL PROTECTIVE BUSHING AT BRANCH CIRCUIT ENTRY |
|
| 08/19/2009 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) OK GROUND RODS-ENSURE COMPLETELY DRIVEN 2) OK GAS AND WATER BOND 3) RECALL AFTER SWING OVER COMPLETE |