Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/16/2010 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 11/25/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TIGHTEN LOOSE FITTINGS AND EMT TO COMPLETELY SEAL INTO CONDUCTORS AND COUPLINGS 2) EQUIPMENT GROUNDS AND NEUTRALS TO BE SEPERATE AT SUB PANEL 3) CONNECT EQUIPMENT GROUND BAR TO PANEL ENCLOSURE AT SUB PANEL 4) SEAL OPENING AT WIRE ENTRY WITH NON COMBUSTIBLE MATERIAL AT BACK OF SUB PANEL 5) CHECK ALL WIRE TERMINATIONS TIGHTENED PER MANUFACTURES REQUIREMENT 6) #8 AL GOOD FOR 30 AMP ONLY 7) 1 1/4" EMT NOT SIZED PROPERLY FOR 4-1/0 XHHW 8) PAY REINSPECTION FEE BEFORE NEXT INSPECTION |
|
| 09/01/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 08/31/2009 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/28/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : There is no access to the site.| 920* 1) GATE LOCKED-NO ACCESS |
|
| 08/27/2009 | ELECTRIC - FINAL | Cancelled | CANCELLED PER CONTRACTOR GABE GARCIA #971-1951 | |
| 08/27/2009 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/20/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. TIGHTEN LOOSE FITTINGS 2. VERIFY DERATING ON CABLES AND CONDUCTORS 310.5, 310.16 OUTSIDE HEATING FACTOR 3. PANEL LABELING NOT DONE -- LABEL AS PER 408.4 *SIGNS ON EQUIPMENT "NOT READY" |
|
| 08/19/2009 | ELECTRIC - FINAL | Cancelled | IVRS - RI canceled | |
| 08/19/2009 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* |