Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
Permit Number - T09EL00963
Inspection Description - ELECTRIC - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/05/2009 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) 30 AMP BREAKER AND BOX WILL BE REMOVED (DRYER) AT FINALS FOR APPROVAL |
|
04/28/2009 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NEED BATTERY TYPE SMOKE DETECTORS IN EACH BEDROOM, ONE IN HALLWAY 2) UNDERGROUND SYSTEM ALL RECEPTS TO BE TWO HOLE TYPE OR 3 HOLE PROTECTED BY GFCI (SEE HANDOUT) 3) DRYER DISCONNECTED AT SERVICE PANEL |