Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T09EL00133
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/17/2009 | FIRE - FINAL | Approved | ||
01/26/2009 | FIRE - FINAL | Denied | DO NOT RECONNECT UNTIL FOLLOWING IS DONE 1. Finish covering front patio underneath for proper sprinkler coverage. 2. Drain pipe for rain water from roof blocking sprinkler head remove piping. 3. 8' light lights on west end blocking sprinkler coverage keep 12" away from piping. 4. Security screen door needs thumb style dead bolt lock can not use double cylinder keyed dead bolt locks on egress door. 5. Need up to date fire sprinkler inspection done, this is done yearly last inspection was on Aug. 2004. 6. Need up to date five year fire alarm check valve inspection done, nothing on file. |