Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2009 | INSP - INITIAL CODE ENFORCMENT | Approved | THE BUSINESS (DRY RIVER) IS IN OPERATION AND OPEN TO THE PUBLIC. THE BUILDING DOES NOT HAVE A CERTIFICATE OF OCCUPANCY. INTERIOR OF THE BUILDING AREAS ON THE WALLS AND CEILING HAVE JUNCTION BOXES WITHOUT COVER PLATES. THE FRONT DOOR LOCATION HAS AN EXTENSION CORD HARD WIRED TO THE SWITCH BOX. CEILING AREA CONDUIT HAS DETACHED FROM THE JUNCTION BOX AND LACKS A COVER PLATE. EXTENSION CORDS ARE BEING USED IN LIEU OF PERMANENT WIRING. THE BUILDING INTERIOR IS DIVIDED INTO TWO LARGE ROOMS THE SOUTH ROOM HAS A PARTITIONED WOOD FRAME 10X12 STRUCTURE HAS BEEN CONSTRUCTED AND IS BEING USED BY THE TENANTS AS A RADIO COMMUNICATION CENTER. THIS CENTER IS BEING POWERED BY MULTIPLE POWER STRIPS THAT ARE CONNECTED TO AN EXTENSION CORD. THE VENTING SYSTEM OF THE WOOD BURNING STOVE/ HEATER HAS BROKE OFF (DETACHED) AT EXTERIOR WALL PENETRATION. CEILING IS A SLAT TYPE CONSTRUCTION, PORTIONS OF THE CEILING HAS MISSING SLATS. THE SOUTH ROOM HAS A RAISED TYPE FLOORING SYSTEM WHICH THE FLOOR SHEATHING IS NOT PROPERLY FASTENED TO THE FLOOR JOISTS. |