Case: T09DV05890

Parcel: 13623008V

Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Case Number - T09DV05890

Inspection Description - INSP - FOLLOW UP CODE ENFORCE

Inspection Status - Approved

Date Description Inspector Results Comments
06/11/2010 INSP - FOLLOW UP CODE ENFORCE Approved All violations have been abated, will be closing this case.
03/29/2010 INSP - FOLLOW UP CODE ENFORCE Approved Checked Permits Plus and electrical permit has been finaled, T10EL00306 on 3-2-10. Stopped by site and nothing done to drywall for finish product. Advised management of reinspection fee to be charged. Will check in 30 days.
02/23/2010 INSP - FOLLOW UP CODE ENFORCE Approved Met with management and inspection done. Needing some correction and working on them. Working on getting power back on. Will check in 15 days.
01/26/2010 INSP - FOLLOW UP CODE ENFORCE Approved Nothing done to unit due to no electrical has been restored. Having trouble getting power back on due to company being out of Phoenix. Unit vacant and secured. Went over on reinspection fee being charged if nothing is done by next inspection. Will check in 30 days.
12/21/2009 INSP - FOLLOW UP CODE ENFORCE Approved Met with management and Scott and unable to get power back on due to electrical has not been checked by a licensed contractor. He was going to call and only lacking texture and painting. Once power on will do texture due to needing power for machine. Will check in 30 days.
11/19/2009 INSP - FOLLOW UP CODE ENFORCE Approved Met with management and work being done to unit. Met Scott at site from maintenance and saw work being done. All flooring has been removed and damaged drywall in bedroom removed approximately 100 square feet. All smoke damage has been sealed. Electrical wiring ok, but outlet will be changed. Only permit required is for reconnect for electrical to be turned back on. Will follow up in 30 days.