Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date |
Description |
Inspector |
Results |
Comments |
| 07/09/2009 |
INSP - INITIAL CODE ENFORCMENT |
|
Approved |
EVIDENCE OF RECENT PORCH ADDITIONS ON FRONT OF MAIN STRUCTURE AND REAR OF MAIN STRUCTURE ON SOUTHWEST CORNER.RESEARCH SHOWS THESE TWO PORCHES WERE ADDED WITHOUT PERMITS; STORAGE UNIT LOCATED IN DRIVEWAY IN FRONT OF MAIN STRUCTURE (APPROX. 7'X12'); LUC 3.2.5.3 (C) DOES NOT ALLOW UNATTACHED STRUCTURES TO BE BUILT IN THE AREA BETWEEN FRONT PROPERTY LINE AND FRONT OF PRINCIPAL STRUCTURE. PREVIOUS REAR PORCH ORIGINAL CARPORT CONVERTED TO GARAGE, WORKSHOP, AND REAR ADDITION ALL ADDED UNDER PERMIT. LRP. |