Case: T09DV03994

Parcel: 11619156B

Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Date Description Inspector Results Comments
07/21/2010 INSP - FOLLOW UP CODE ENFORCE Approved ALL REBAR - CONCRETE, FRAMING, AND BUILDING FINAL COMPLETED AND APPROVED BY DSD UNDER PERMIT T10CM00707. FIRE APPROVAL ASKING FOR ADDITIONAL SPRINKLER REPAIRS TO OTHER STRUCTURES NOT REQUIRED UNDER OUR REPAIR PERMIT. COMPLIANCE CLOSE CASE
03/16/2010 INSP - FOLLOW UP CODE ENFORCE Approved MET ON SITE WITH NEW CONTRACTOR RIVAS BUILDERS AND OWNER JAMES LEBEAU. EXPLAINED THAT WHEN BETTERWAY SERVICES WAS LET GO THAT THEY HAD WITHDRAWN THE PERMIT AND THAT A NEW PERMIT WOULD NEED TO BE SECURED FOR THE WORK THAT HAS ALREADY BEEN COMPLETED. RIVAS AND LEBEAU AGREED TO GO TO DSD AFTER OUR MEETING TO RESECURE A PERMIT. RIVAS WAS NEVER MADE AWARE BY OWNER THAT PERMIT WAS NEEDED, DUE TO ORIGINAL PERMIT BEING WITHDRAWN. THIRTY DAY F/U INSPECTION REQUIRED.
02/16/2010 INSP - FOLLOW UP CODE ENFORCE Approved VISITED SITEK ALL REPAIRS COMPLETED, BUT PERMITS WITHDRAWN AND NO INSPECTIONS. SPKE TO OWNER WHO MENTIONED THAT PLANS WERE DRAWN AND PERMITS SECURED. BETTER WAY SERVICES WAS HIRED TO DO THE WORK AND THEN LET GO DUE TO COST. RIVAS BUILDERS WAS THEN HIRED TO COMPLETE THE WORK, A BID WAS OBTAINED IN JANUARY 2010 AND WORK COMPLETED. RIVAS IS RESPONSIBLE FOR HAVING PERMIT REISSUED AND INSPECTIONS COMPLETED. BID WAS JUST ISSUED 1/21/10 AND WORK RECENTLY COMPLETED.
CARLOS GAVE THE OK TO ALLOW OWNER THE TIME TO GET PERMIT RE ISSUED AND INSPECTIONS COMPLETED SINCE THE WORK IS ALREADY DONE.
10/05/2009 INSP - FOLLOW UP CODE ENFORCE Approved FOUND RAFTERS, STUDS, POSTS AND METAL ROOFING HAD ALL BEEN REMOVED AND BEAMS SHORED (TEMP SHORING). CHECKED P+ (10.06.09) AND FOUND PERMITS WERE SECURED AND ISSUED 09.25.09 FOR THE STORM DAMAGE REPAIRS. F/UP 01.15.2010 T09CM02507
09/15/2009 INSP - FOLLOW UP CODE ENFORCE Approved CALLED BETTERWAY SERVICES DEPT, SPOKE WITH TODD WHO MENTIONED PERMITS HAD BEEN COMPLETED BY ARCHITECT TIM BURNS AND STAMPED BY ENGINEER STEPHEN HASS AN THAT PLAS ARE BEING WALKED THRU DSD. HASS AN DBURNS HAVE BEEN DOWN TO DSD, CHANGED REQUREID BY DSD AND THAT PLANS ARE NOW BEING HELD UP IN FLOODPLAIN DUE TO THE WASWH THAT WAS DIRECTLY BEHIND PROPERTY AND EXISITING BUILDING. PROBLEM BEING THAT WASH IS UNDER CUTTING THE EXISTING PIERS TO THE DAMAGED STRUCTURE. TODD EXPECTS A COUPLE OF WEEKS BEFORE PLANS ARE APPROVED, BUT WERE WALKED THRU 09/15/09