Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2010 | INSP - FOLLOW UP CODE ENFORCE | Approved | SITE INSPECTION SHOWS ALL BUILDING HAVE BEEN COMPLETED, AND HAVE BEEN PAINTED. ALL VIOLATION HAVE BEEN ABATED. CLOSE. |
|
| 12/03/2009 | INSP - FOLLOW UP CODE ENFORCE | Approved | SITE INSPECTION SHOWS WORK BEING DONE PER PERMITS, ALL INSPECTIOIN HAVE BEEN THANK PLACE. FU 60 DAYS |
|
| 11/02/2009 | INSP - FOLLOW UP CODE ENFORCE | Approved | Follow-up site inspection found work continuing with all permits. Follow-up within 30 days. | |
| 08/12/2009 | INSP - FOLLOW UP CODE ENFORCE | Approved | FOLLOW UP NOTES STORED IN SIRE FU 28 AUG09 |
|
| 06/15/2009 | INSP - FOLLOW UP CODE ENFORCE | Approved | I conducted an inspection on the 11th of June, and found no new work had taken place since our last visit to the site. So I called Mike R. in Houston Tx. He says he was having issues arranging the financing, but now it had been resolved and the removal of the stucco should commence shortly. I also called George G. Lance with L 2 ARCHITECTS, he stated that he was also concerned about the lack of progress on the site. But it looks likes from the communications with the Architect and Engineer, Desert View Stucco is scheduled to be on site on 22 June 09. | |
| 05/26/2009 | INSP - FOLLOW UP CODE ENFORCE | Approved | PLANS HAVE BEEN SUBMITTED TO DSD AND APPROVED FOR SHORING. DSD STATES NO PERMITS NEEDED - WORK BEING DONE TO BLDG #4 30 DAY FU |