Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/20/2011 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
PERMITS WERE SECURED AND HAVE BEEN FINALED UNDER CASE #T09CM01965 // WILL MOVE TO CLOSE OUT // AV |
| 06/17/2009 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
06/17/09 - ARRIVED ON LOCATION TO CHECK PROGRESS // SHEET ROCK STILL REMOVED ON ALL UNITS // WORK HAS STOPPED// MET WITH MANAGEMENT STILL WORKING THRU AND WITH INSURANCE // EXPLAINED AGAIN HOW PERMITS WILL NEED TO BE SECURED ONCE REPAIR WORK BEGINS THEY UNDERSTOOD FROM THE LAST TIME // AV |
| 04/29/2009 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
04/28/2009- FOLLOW- WORKER(VICTOR) FROM JARCO CONSTRUCTION WAS ON SITE- AT THIS POINT ALL SHEETROCK IS BEING REMOVED FROM CEILING AND WALLS TO EACH UNIT TO ASSESS THE EXTENT OF DAMAGE TO STRUCTURE AND WIRING// MET WITH MANAGER ADVISED HER TO MAKE SURE PERMITS ARE PULLED// WILL BE NEEDED WHEN ASSESSMENT IS COMPLETED // WILL FOLLOW UP IN 45 DAYS // AV |