Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
Case Number - T09DV01035
Inspection Description - INSP - FOLLOW UP CODE ENFORCE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/10/2010 | INSP - FOLLOW UP CODE ENFORCE | Approved | Permit finaled, T10BU00378 on 4/05/10. At site found all bag bolts replaced. Replaced railing, pickets and headers. Close case. | |
02/04/2010 | INSP - FOLLOW UP CODE ENFORCE | Approved | Went to location to see if any work has been done without permits. No work has been done. Spoke to manager, said that engineering company has been there a couple of times. Called and e-mailed Charlie with Praxis Construction Group. F/U 60 days. | |
12/04/2009 | INSP - FOLLOW UP CODE ENFORCE | Approved | E-MAIL RECIEVED. EXTENSION REQUEST GRANTED. F/U 60 DAYS | |
11/06/2009 | INSP - FOLLOW UP CODE ENFORCE | Approved | AT SITE, SPOKE TO MANAGER. HE GAVE ME EMAIL ADDRESS. EMAILED CONTRACTOR, WTILL WORKING ON A PERMIT PACKAGE. COPY OF EMAIL IN FILE. NO REINSPECTION F/U 30 DAYS | |
10/06/2009 | INSP - FOLLOW UP CODE ENFORCE | Approved | SPOKE TO CHARLIE, STILL IN PROCESS OF GETTINGS BIDS ON CONTRACT. F/U 30 DAYS | |
09/01/2009 | INSP - FOLLOW UP CODE ENFORCE | Approved | AT SITE, MET WITH BRIAN FROM MET MANAGEMENT AND CHARLES GATE, CONTRACTOR FROM PRAXIS. DISCUSSED TWISTED AND ROTTED HEADERS. RAILING AND PICKETTS. ON BUILDING 280 THERE ARE 3 TWISTED HEADERS. BRIAN SAID HE WOULD GET AN ENGINEER OUT TO LOOK AT THEM TO SEE IF THEY COULD BE REPLACED. RAILING SHOULD BE PERMITTED AND INSPECTED TO WITHSTAND 200 LBS OF FOCE BY DSD. F/U 30 DAYS |