Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2010 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 03/30/2010 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 03/30/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) MUST BE 10 POUNDS-IS AT 6 2) REMOVE MESH STAPLES AT HOMERUNS AND REPLACE DAMAGED WIRING 3) DWV TEST IS EMPTY-REDO 4) NEED FULL WATER PRESSURE ON LINES 5) FIRE BLOCK DRYER VENT STUD BAY 6) STUD SHOE ALL STUDS THAT ARE OVER BORED/NOTCHED IN REAR GARAGE SHEARWALL 7) NEED NUTS ON HOLDOWNS 8) REDO GAS TEST 9) FIREBLOCK A/C LINE STUD BAY 10) INSTALL BACKFLOW PREVENTERS ON HOSE BIBS 11) STOPPED INSPECTION AFTER GARAGE, LAUNDRY AND S.E. BEDROOM |