Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/09/2011 | ENGINEERING - FINAL | Approved | APPROVED WITH E-MAIL 12-7-2011 FROM JIM VOGELSBERG AND GRADING CERT LETTER FROM ARCHITECT. | |
| 12/08/2011 | ENGINEERING - FINAL | Continued | PROVIDE LETTER FROM ENGINEERING GRADING CERT. | |
| 12/07/2011 | ENGINEERING - FINAL | Partial Approval | PLEASE RETAIN THIS E-MAIL Abstract: A new sanctuary for the Tucson Area Christian Fellowship, activity T09CM03321 ,1212 S Palo Verde Av was designed with four roof drains; these drain spouts discharge onto the sidewalk which adjoins the building. Findings: Extenuating circumstances associated with Staff's interpretation of the Development Standards which govern stormwater that crosses pedestrian / sidewalks, the intended use of the structure, coupled with directions provided by PDSD to the consultant on two separate occasions, yield the following: The down spout that is located at the corner of the building, adjacent to the landscaped area, is to be redirected so that the stormwater flows into the landscape area. The diverting of the stormwater will maintain a clear, pedestrian path to the building. The remaining down spouts, if the applicant chooses, may remain in the as-built configuration. Please see me if you have any questions or require further information. Jim Vogelsberg, PE Administrator Planning and Development Services Department |
|
| 11/23/2011 | ENGINEERING - FINAL | Partial Approval | GO TO 201 NORTH STONE AND ASK FOR A D.S.M.R. FOR THE ROOF DRAINAGE THAT IS BEING DEPOSITED ONTO THE SIDEWALKS ALONG THE SOUTHSIDE OF THIS SITE. THESE CHANGES CANNOT BE ACCEPTED UNLESS THIS HAS BEEN REVIEWED AND DETERMINED THAT THE DRAINAGE PIPES CANNOT BE COMPLETED IN ANY OTHER ACCEPTABLE MANNER. |